This is the subject of the Hoopa Valley Tribe's motion for a Preliminary Injunction. See link to the final report.


https://www.trrp.net/restoration/flows/winter-flow-variability/

Winter Flow Variability
  
Updated February 14, 2022.

Thank you to all who provided input on our Draft Trinity River Winter Flow Variability Environmental Assessment. Your input has been helpful in our effort to understand implications of the proposed action and to analyze potential impacts of the recommended flow change. Reclamation did not implement the winter flow regime in water year 2022 but the TRRP is exploring our options for water year 2023. Our winter flow analyses are now available in report format at the TRRP DataPort. 

Photo 1. Trinity River release from Lewiston Dam (photo by TRRP)

Project Background

Following the 2000 Record of Decision (ROD), the U.S. Department of Interior (DOI) established TRRP to restore the fisheries of the Trinity River affected by dam construction and related diversions of the Trinity River Division of the Central Valley Project1. The Trinity River has also been impacted by past mining and timber harvest activities in the watershed, and these conditions are collectively addressed as well through TRRP’s restoration efforts.
   
   -    1 https://www.usbr.gov/mp/cvp/

Administered by the U.S. Bureau of Reclamation (Reclamation), the TRRP is a partnership of federal and state resource agencies, Tribes, and Trinity County. The Program works to restore the processes and attributes of an ecologically functioning river system, which should, in turn, recover diminished salmon and steelhead populations while retaining Trinity and Lewiston Dams’ deliveries of water and power to California’s Central Valley.

There are five primary components of TRRP’s river restoration work:
   
   - Variable annual instream flows: releasing water from Lewiston Dam, based on the water year type   2, to mimic natural Trinity River flows and interact with downstream areas to enhance conditions for all life stages of fish and wildlife. These variable annual instream flows are also sometimes called “restoration releases”.      
      -       2 TRRP uses five water year types to determine how much water will be available to the Trinity River each year. The five water year types are: Critically Dry, Dry, Normal, Wet, and Extremely Wet. A wetter water year means more water is available for restoration flow releases.

   - Channel rehabilitation: restoring the functional floodplain of the river, which has been channelized and simplified by managed river flows and mining.
   - Sediment management: reintroducing gravel (aka coarse sediment) to the river. Gravel provides spawning areas for salmon and provides other habitat benefits. Gravel entering the river system upstream of the dam is blocked from being transported to the Trinity River below Lewiston Dam, creating a gravel deficit in the river over time. TRRP resupplies the river with gravel to make up for the dam’s impact in blocking new gravel supplies that would otherwise be provided naturally.
   - Watershed restoration: addressing negative impacts that have resulted from poor land management in the basin. Watershed restoration activities include decreasing the input of fine sediment from Trinity River tributaries that can clog spawning gravels and fill deep areas of the river.
   - Adaptive management: monitoring, evaluating, and improving the effectiveness of river restoration actions.

The TRRP is exploring changes toward how variable annual instream flows are managed (Primary TRRP Component #1) with existing ROD water from Lewiston Dam. Since the implementation of the ROD, variable flow releases (aka restoration releases) have occurred after the water year type is determined in mid-April3. An approved hydrograph (i.e. water release schedule) developed by TRRP determines how much water is released daily during this period of elevated flows. Variable releases typically extend to early summer before returning to baseflow conditions and then remain at baseflow until the following April when a new water year is determined.
   
   -    3 The water year type is determined by the Department of Water Resources’ B120 (ca.gov) water supply forecast.

Photo 2. Young salmon on the Trinity River (photo credit Yurok Tribe Fisheries Department)

The current approach to implementing variable flows in the Trinity River results in cold water releases from Lewiston Dam that are out of sync from when the pre-dam Trinity River would have naturally received seasonal peak flows. Undammed tributaries to the Trinity River naturally flow higher during winter storm events, and as high elevation snowpack melts in early spring. Thus, natural contributions to the Trinity River from its tributaries are often receding by the time ROD flow releases from Lewiston Dam occur after mid-April.

The asynchrony between flow management and the natural variability of pre-dam flows has cascading impacts on the river’s form and ecology, and perhaps the most detrimental of the impacts is to young salmon. Pacific salmon’s life history has adapted to the natural seasonal variability of flows for millions of years. Current flow management keeps river conditions unnaturally cold, which suppresses metabolic rates during the key period of growth for young salmon. Later in the spring, the unnaturally cold river delays environmental cues that trigger smolts to outmigrate to the ocean before conditions in the lower Klamath become too warm to support salmon migration.

Winter Flow Variability Goals and Objectives

The purpose and need for winter flow variability is to refine the timing of restoration flows using the principle of AEAM to better meet geomorphic, fish habitat, and temperature objectives of the ROD. Moving a portion of the ROD volume released from Lewiston Dam to the winter period is intended to have the following benefits to the natural character of the Trinity River:
   
   - Time restoration releases from Lewiston Dam to better match natural flow variability during winter and spring runoff events. Coinciding natural flows and Lewiston dam releases would enhance natural cleaning and transport of river gravels.
   - Limit the impact that cold water from the dam has on the growth of juvenile salmon by shifting a portion of ROD water from Lewiston Dam to the winter period.
   - Allow the river to naturally warm earlier in the season than currently occurs to provide the environmental cues smolts rely upon in timing their outmigration to the ocean.
   - Provide elevated flows before salmon fry emergence to increase food availability and higher river levels after emergence to increase access to floodplain nursery habitats
   - Move ROD water allocations earlier to maintain more consistent lake levels in Trinity Reservoir through the summer months.

Description of Potential Winter Flow Variability Actions

Shift a portion of the ROD water for release during the winter to two distinct periods termed the Flow Synchronization Period and the Elevated Baseflow Period (Figure 1).

Flow Synchronization Period: Between December 15 and February 15, ROD water equivalent to 60,000-acre-feet would be released from Lewiston Dam when forecasting tools at downstream gages anticipate a rise in river levels of 4,500 to 12,000 cubic feet per second (cfs). The maximum scheduled flow from Lewiston Dam during this period would not exceed 6,500 cfs. The optimal combination of natural and dam-regulated flows to the Trinity River resulting from this flow synchronization would be adjusted downward, as necessary, to prevent flooding or damage to downstream properties.

Elevated Baseflow Period: Between February 15 and April 15, ROD water would be released from Lewiston Dam based on the Department of Water Resource’s B120 water supply forecast. Using the B120 would prevent the overuse of ROD water should the water year end up being drier than expected. During this period, a hydrograph would be developed by TRRP to schedule the elevated baseflow releases.

After April 15, the remaining ROD water would be released to the Trinity River using the same methodology that currently exists for the scheduling of restoration flows. No changes to summer baseflow (450 cfs) or winter baseflow (300 cfs) are anticipated in the near future. 

The maximum winter release of ROD water under these Winter Flow Variability actions would differ from year to year based on the water year type, as follows:
   
   - 60,000 acre-feet in a Critically Dry water year,
   - 80,000 acre-feet in a Dry water year,
   - 120,000 acre-feet in a Normal water year,
   - 180,000 acre-feet in a Wet water year, and
   - 220,000 acre-feet in an Extremely Wet water year

Figure 1: Winter Flow Variability Actions Compared to Existing Conditions (No Action), Using the 2016 Wet Water Year as an Example.
The blue line represents the hydrograph that was implemented in 2016. Green represents the timing of hypothetical water releases that could occur with Winter Flow Variability. Grey line represents the full natural flow. The full natural flow is the unimpeded contributions from the blocked watershed area above Lewiston Dam. It shows the timing of when water would have naturally been contributed to Trinity River if not impounded by Trinity Lake.

Possible Impacts

Possible impacts related to this management action that TRRP has been assessing include:
   
   - Impacts on hydropower generation
   - Recreational impacts, including fishing, rafting, and boating
   - Biological impacts to the fishery, wildlife, vegetation, and wetlands

Further Information
   
   - TRRP Synthesis Reports Web Page
   - Reports that contrast current winter baseflows with more natural flows:      
      - Buxton, T. H. 2021. History of fine sediment and Its Impacts on physical processes and biological populations in the restoration reach of the Trinity River, CA. Report TRRP-2021-1 for the Trinity River Restoration Program (TRRP). TRRP, Weaverville, California.
      - Gaeuman, D. and R. Stewart. 2017. Sediment transport in the Trinity River, CA: data synthesis 2004-2015. Report TR-TRRP-2017-1 for the Trinity River Restoration Program (TRRP). TRRP, Weaverville, California.
      - Thomas Gast & Associates. 2021. Analysis and model evaluation of long-term data collected at the Willow Creek outmigrant trap. Report 20190910YTFP for the Trinity River Restoration Program (TRRP). Thomas Gast & Associates Environmental Consultants, Arcata, California.

   - External Web Page: Trinity River Benthic Macroinvertebrate Drift project
    
 
Tom Stokely Salmon and Water Policy Consultant530-524-0315 tstokely at att.net 
 

    On Tuesday, December 20, 2022 at 11:37:16 AM PST, Tom Stokely <tgstoked at gmail.com> wrote:  
 
 This is about the Winter Flow Variability proposal even though it doesn’t mention it.

https://mavensnotebook.com/2022/12/17/this-just-in-bureau-of-reclamation-plans-to-set-aside-a-twenty-two-year-old-agreement-on-trinity-river-hoopa-valley-tribe-asks-for-injunction/


Sent from my iPhone
_______________________________________________
env-trinity mailing list
env-trinity at mailman.dcn.org
http://mailman.dcn.org/mailman/listinfo/env-trinity
  
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.dcn.org/pipermail/env-trinity/attachments/20221220/fbc422f2/attachment-0001.html>


More information about the env-trinity mailing list