> hi All -
>
> The Contractor, Erick Ammon, Inc., will start work next week on the
> Lewiston-Dark Gulch Channel Rehab Project. We will be working 6 days a
> week to get as much work done in the active river channel before the
> in-river work period ends on Sept 15, as possible. The first priority
> is to get in-river work completed in the Lewiston area (e.g., placement
> of coarse sediment bars). After the in-river work period is over, work
> will move to the floodplains where floodplain lowering and side channel
> construction will take place under conditions that are isolated from the
> river.
>
> If you have any questions, please give me a call.
>
> Best Regards-
> Brandt
>
>
>
> ____________________________
> Brandt Gutermuth
> Environmental Specialist
> Trinity River Restoration Program
> PO Box 1300 (mailing)
> 1313 S. Main Street (physical)
> Weaverville, CA 96093
> 530.623.1806 (voice)
> 530.623.5944 (fax)
> www.trrp.net (website)