[env-trinity] San Luis (Westlands included) DEIS Contract Renewal Comments
Byron
bwl3 at comcast.net
Mon Nov 21 18:19:26 PST 2005
Released On: November 21, 2005
Comment Period Extended for Environmental Document for Renewal of San Luis
Unit CVP Long-Term Water Service Contracts
The 45-day public review and comment period for the San Luis Unit Draft
Environmental Impact Statement (EIS) for the proposed long-term Central
Valley Project (CVP) water service contracts has been extended from November
25, 2005 to December 16, 2005.
Written comments on the Draft EIS must be received by close of business on
Friday, December 16, 2005, and should be sent to: Mr. Shane Hunt, Bureau of
Reclamation, South-Central California Area Office, 1243 N Street, Fresno, CA
93721. Comments may also be e-mailed to shunt at mp.usbr.gov. For additional
information or to request a copy of the draft document, please contact Mr.
Hunt at 559-487-5138, TDD 559-487-5933. The Draft EIS is also available
online at http://www.usbr.gov/mp/nepa/nepa_projdetails.cfm?Project_ID=63.
# # #
Reclamation is the largest wholesale water supplier and the second largest
producer of hydroelectric power in the United States, with operations and
facilities in the 17 Western States. Its facilities also provide substantial
flood control, recreation, and fish and wildlife benefits.
Relevant Links:
Draft EIS
Policy | Disclaimer | Accessibility | FOIA | Quality of Information | FAQ
DOI | Recreation.gov | FirstGov
Byron Leydecker,
Chair, Friends of Trinity River
Consultant, California Trout, Inc.
PO Box 2327
Mill Valley, CA 94942-2327
415 383 4810 ph
415 383 9562 fx
bwl3 at comcast.net
bleydecker at stanfordalumni.org (secondary)
http://www.fotr.org
http://caltrout.org
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www2.dcn.org/pipermail/env-trinity/attachments/20051121/0122b4ed/attachment.html>
More information about the env-trinity
mailing list